Integrated Water Resource Management in the Seeland and the Broye watershed

Clients

The Federal Offices for Agriculture, for the Environment and for Spatial Development of the states of Fribourg, Bern and Vaud

Project dates

2009 – 2014, followed by a 5-year implementation phase (2015-2019)

Context and objectives

  • The project is part of the 32 projects list supported by the third phase of the “Model projects for a sustainable land development 2014-2018“ program.
  • The region is of national strategic importance for agricultural production.
  • There is a need for a sustainable water management considering the increasing frequency of shortage and excess of water.
  • There is a new political strategy for climate change adaptation.
  • There is a lack of coordination between the three involved states due to the complexity of the organizational structures.
  • Define the bases and the instruments for a IWRM
  • Develop the framework conditions of a IRWM in the concerned state institutions (BE, FR, VD)
  • Analyze the replicability of the approach in other territories.

Outcomes

  • Conduction of a summary that captures, collects, compares and analyzes the various needs and types of water uses as a resource as well as the protection measures.
  • Identification of solutions for existing and potential conflicts, at the organizational level (who), on roles and procedures (what, how) and at a technical level (which infrastructure) as part of pilot projects.
  • Proposal for short-term recommendations (shortage / excess) and long term management (sustainable water management) for the respective stakeholders and decision makers.